Installation; Unpacking And Checking Equipment; Selecting The Location; Installing The Heat Shield, Draft Shield And Pan Support - OHAUS MB35 Manual De Instrucciones

Analizador de humedad
Ocultar thumbs Ver también para MB35:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EN-4

2. Installation

This section contains unpacking and installation instructions for your new Moisture Analyzer .

2.1 Unpacking and Checking Equipment

Open the package and remove the instrument and the accessories. Check the completeness of the delivery.
The following accessories are part of the standard equipment of your new Moisture Analyzer.
— 1 Box, Aluminum sample pans
— 1 Pan support
— 1 Specimen sample (circular, absorbent cellulose disk)
— 1 Draft shield element
— 1 Heat shield
— 1 Power cable
— 1 Set of operating instructions
— 1 Warranty card
Remove packing material from the instrument. Check the instrument for transport damage. Immediately inform your
Ohaus dealer if you have complaints or parts are missing. Store all parts of the packaging. This packaging guaran-
tees the best possible protection for the transport of your instrument.

2.2 Selecting the Location

The Moisture Analyzer should always be used in an environment which is free from excessive air currents, corrosives,
vibration, and temperature or humidity extremes. These factors will affect displayed weight readings.
DO NOT install the Moisture Analyzer next to:
• Open windows or doors or vents causing drafts or rapid temperature changes.
• Near vibrating, rotating or reciprocating equipment.

2.3 Installing the Heat Shield, Draft Shield and Pan Support

PAN SUPPORT
DRAFT SHIELD
HEAT SHIELD
Install the heat shield, draft shield and pan support as shown. Turn the pan
support until it engages In the locked position.
MB35

Publicidad

Tabla de contenido
loading

Tabla de contenido