Descargar Imprimir esta página

Kohler K-557 Guia De Instalacion página 12

Válvula termostática de tres puertos
Ocultar thumbs Ver también para K-557:

Publicidad

Idiomas disponibles

Idiomas disponibles

8. Installation Checkout
Turn on the water supply to the valve.
Test for Leaks without an Interface
Disconnect the power from the valve.
Connect the jumper to the valve, then reconnect the power.
Wait 10 seconds for the valve to initialize; the outlets will activate.
Check all connections for leaks.
Disconnect the power, then remove the jumper.
Reconnect the power to the valve.
Test for Proper Operation (Requires an Installed Interface)
Press the power icon on the user interface. The interface screen should be lit.
If not already completed, refer to the "Digital Interface Homeowners Guide" to set up the interface.
NOTE: For more information about using the interface, refer to the "Digital Interface Homeowners
Guide."
Use the interface to turn on the water outlets.
Check for leaks and make any adjustments as needed.
Verify that the water flow is sufficient for your showering needs.
Exercise the Valve (Requires an Installed Interface)
NOTE: Valves which have been recently installed, or have not been used for some time should be
exercised before running tests or setting the maximum temperature.
NOTE: The maximum water temperature to the outlets is limited to 120°F (49°C). The valve will
automatically shut down if the temperature exceeds 120°F (49°C).
Verify that the hot and cold water supply lines are connected to appropriate valve inlets.
Using the up and down arrow icons on the user interface, adjust the temperature from cold to hot
and back to cold several times, pausing for 30 seconds at each extreme.
1217542-2-B
Jumper
12
Kohler Co.

Publicidad

loading

Este manual también es adecuado para:

K-557-k-na