Descargar Imprimir esta página

Kohler K-557 Guia De Instalacion página 8

Válvula termostática de tres puertos
Ocultar thumbs Ver también para K-557:

Publicidad

Idiomas disponibles

Idiomas disponibles

2-3/4"
(70 mm)
Min
Drip Loop
3. Prepare the Site
NOTICE: The valve will not fit within a standard stud cavity. A minimum 18" (457 mm) x 18" (457 mm)
cavity is required.
NOTE: Horizontal wall installation is shown. The valve can also be wall-mounted vertically or mounted
to a horizontal surface. Refer to the "Mounting Configurations" section.
Construct a minimum 18" (457 mm) wide 2x4 stud cavity.
Install adequate bracing for mounting the valve. Notch the bracing as needed to accommodate the
inlets and outlets.
4. Install the Electrical Outlet
NOTICE: Do not install the valve under a whirlpool surround or any location where the temperature may
exceed 104°F (40°C). The valve and its integrated power supply is rated to operate in temperatures up to
104°F (40°C).
Install a 120 V GFCI electrical outlet within the stud framing, in close proximity to the valve. Locate
the outlet above the valve.
1217542-2-B
Board Mount
18"
(457 mm) Min
Place the outlet
higher than
the valve.
9-1/2"
(241 mm)
Notch bottom brace.
8
Cross Brace Mount
18"
(457 mm) Min
11-5/8"
(295 mm)
12-1/2"
(318 mm)
Kohler Co.

Publicidad

loading

Este manual también es adecuado para:

K-557-k-na