Descargar Imprimir esta página

ABB ACH580-34 Guía Rápida De Instalación Y Puesta En Marcha página 18

Ocultar thumbs Ver también para ACH580-34:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 67
18 EN – Quick installation and start-up guide
X10 24 V AC/DC
EN
DA
Total load capacity of the auxiliary voltage output +24 V (X2:10) is 6.0 W (250 mA /
24 V DC). Tightening torques 0.5...0.6 N·m (4.4...5.3 lbf·in). Wire strip length 7...8 mm
DE
(0.3 in). All terminal sizes 0.14...2.5 mm
support 10...24 V AC.
ES
Remove the cardboard covers
FI
After the electrical installation has been done and there is no danger of dropping
FR
screws or anything else inside the drive or LCL filter module, remove the cardboard
covers from the top of them. See
IT
covers (page
304).
NL
EIA-485 embedded fieldbus connection
PL
You can connect the drive to a serial communication link with a fieldbus adapter
PT
module or the embedded fieldbus interface. The embedded fieldbus interface supports
BACnet MSTP protocol.
SV
To configure BACnet MSTP communication with the embedded fieldbus:
TR
1.
Connect the fieldbus cable and the required I/O signals.
2.
If the drive is at the end of the fieldbus, set the termination switch to ON.
ZH
3.
Power up the drive and set the required parameters. See
communication (page
Start up the drive
Before you start up the drive, make sure that the installation is completed.
Make sure also that it is safe to start the motor. Disconnect the motor from
other machinery if there is a risk of damage or injury.
Before you activate the automatic fault reset or automatic restart functions
of the drive control program, make sure that no dangerous situations can
occur. These functions reset the drive automatically and continue operation
after a fault or supply break. If these functions are activated, the installation
must be clearly marked as defined in IEC/EN/UL 61800-5-1, subclause 6.5.3,
for example, "THIS MACHINE STARTS AUTOMATICALLY".
Connection
34
34
35
35
36
36
37
37
38
38
40
40
41
41
Installing the air baffles and removing the cardboard
20).
Term
OUT1
Safe torque off. Factory connection. Both
circuits must be closed for the drive to
OUT2
start.
SGND
IN1
IN2
24 V
External 24 V AC/DC input to power up the
AC/DC+ in
control unit when the main supply is discon-
nected.
24 V
AC/DC- in
2
(26...14 AWG). Digital inputs DI1...DI5 also
Description
Fieldbus

Publicidad

loading