Descargar Imprimir esta página

Riello FS10 Instrucciones De Instalación, Uso Y Mantenimiento página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

TEST BOILER
The working field has been defined according to EN 676 standard.
COMMERCIAL BOILERS
The burner-boiler matching is assured if the boiler conforms to EN 303 and the combustion chamber dimen-
sions are similar to those shown in the diagram EN 676. For applications where the boiler does not conform to
EN 303, or where the combustion chamber is much smaller than the dimensions given in EN 676, please con-
sult the manufacturers.
CORRELATION BETWEEN GAS PRESSURE AND BURNER OUTPUT
To obtain the maximum output, a gas head pressure of 5.8 mbar is measured (M2, see chapter 3.3, page 4) with
the combustion chamber at 0 mbar using gas G20 with a net heat value of 10 kWh/Nm
7
6
5
4
3
2
1
40
D5257
40,000
3.
INSTALLATION
THE BURNER MUST BE INSTALLED IN CONFORMITY WITH LEGISLATION AND LOCAL STANDARDS.
3.1 BOILER FIXING
IMPORTANT
Boiler door must have a max. thickness of 90 mm,
refractory lining included.
If thickness is greater (max. 150 mm), a combustion
head extension must be fitted, which is supplied
separately.
HINGE
ASSEMBLY
2824
50
60
70
50,000
60,000
S7392
80
90
100
70,000
80,000
Separate the combustion-head assembly
from the burner body by removing nut (1) and
removing group (A).
Fix the head assembly group (B) to the boiler
(2) insert the supplied insulating gasket (3).
A
3
GB
(8,570 kcal/Nm
3
110
120
kW
90,000
100,000
kcal/h
Thermal power
1
3
B
).
3
2
D5108

Publicidad

loading

Este manual también es adecuado para:

3756433