Descargar Imprimir esta página

Maxeon SunPower Reserve Instrucciones De Instalación página 42

Sistema de almacenamiento de energía para el hogar
Ocultar thumbs Ver también para SunPower Reserve:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

6.5.3. Power cable connection
Power cable connection instructions:
1.
Take out the battery power cables from the inverter package.
2. Remove the protective caps from the battery power connectors.
3. Connect the battery power cables to the inverter and battery packs.
Please pay attention to the connector polarity, red is for battery positive.
BAT Power + and Red Cable (positive)
© 2023 Maxeon Solar Technologies, Ltd. All rights reserved. | 547143 Revision B - June 2023
Specifications included in this document are subject to change without notice
Without
Terminal
Resistor
BAT+
BAT-
Inverter side
4
3
BAT+
BAT+
BAT Power - and Black Cable (negative)
2
1
BAT-
BAT-
BAT side
41

Publicidad

loading

Este manual también es adecuado para:

Reserve-inv-1-p5-l1-intReserve-bat-1-dc-10.1-int