Descargar Imprimir esta página

Mitsubishi Electric TRANE TURYP0723AN40AN Manual De Instalación página 42

Publicidad

Idiomas disponibles

Idiomas disponibles

10-5-2. Fixing the cables in place
Route the cables as shown in the figures below.
・P072, E072 (460 V)
Main Box
Transmission terminal block
Rubber bushing
(for main inverter connection
wiring (200 V) and unit wiring
(solenoid coil wiring))
Tie band
(Supplied)
Rubber bushing 2
Unit wiring (sensor wiring)
・P072, E072 (208–230 V)
Main Box
Transmission terminal block
Rubber bushing
(for Fan cable and unit wiring
(solenoid coil wiring))
Tie band
(Supplied)
Rubber bushing 2
Unit wiring (sensor wiring)
WT09115X03
Main inverter
connection wiring
(low voltage)
Fill the gap.
Main inverter
connection wiring
(low voltage)
Fill the gap.
GB-40
Inverter Box
Power supply terminal block
Cable strap
Rubber bushing
(for FAN cable)
Tie band
(Supplied)
Rubber bushing 1
Power cable
(not supplied)
Transmission cable (not supplied)
The length of the section after the cable
access hole must be at least 1100 mm (43 in).
Inverter Box
Power supply terminal block
Cable strap
Rubber bushing
(for FAN cable)
Tie band
(Supplied)
Rubber bushing 1
Power cable
(not supplied)
Transmission cable
(not supplied)

Publicidad

loading