Descargar Imprimir esta página

Health O Meter 500KL Manual Del Usuario página 201

Ocultar thumbs Ver también para 500KL:

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS (CONTINUED)
4. Locate the load cell connector
cable inside column A. While
holding column B, slide the
cable through the center
opening at the top of column
B. Push the cable all the way
through Column B until the
plug reaches the bottom of the
column.
5. Align column A and column B.
Notches are located at the
bottom of column A and the
top of column B. Snap the
locking tab into place. Ensure
that the locking tab is locked
securely into place. Note:
When aligning and locking
the columns, use caution
not to pinch the load cell
connector cable.
P/N UM500KL 500KG Rev 20191120
Column B
(top)
Column B
(top)
Load cell
connector
cable
Column B
(top)
Notches
Locked position
200
Back to Home Page
Column A
(bottom)
Load cell
connector
cable
Column B
(bottom)
Column A
(bottom)
Locking tab

Publicidad

loading

Este manual también es adecuado para:

500kg