Note!
Confirm that installation and start-up have been carried out correctly
using the installation and commissioning certificate. This action is a
prerequisite for the making of warranty claims.
–
Have the Reflex Customer Service carry out commissioning and
the annual maintenance.
6.1
Installation conditions
6.1.1
Incoming inspection
Prior to shipping, this device was carefully inspected and packed. Damages
during transport cannot be excluded.
Proceed as follows:
1.
Upon receipt of the goods, check the shipment for
•
completeness and
•
possible transport damage.
2.
Document any damage.
3.
Contact the forwarding agent to register your complaint.
6.2
Preparatory work
Condition of the delivered device:
•
Check all screw connections of the device for tight seating. Tighten the
screws as necessary.
Preparing the device installation:
•
No access by unauthorised personnel.
•
Frost-free, well-ventilated room.
–
Room temperature 0 °C to 45 °C (32 °F to 113 °F).
•
Level, stable flooring.
–
Ensure sufficient bearing strength of the floor before filling the
vessels.
•
Filling and dewatering option.
–
Provide a DN 15 filling connection according to DIN 1988 - 100 and
En 1717.
–
Provide an optional cold water inlet.
–
Prepare a drain for the drain water.
•
Electric connection, 5 "Technical data", 22.
•
Use only approved transport and lifting equipment.
–
The load fastening points at the vessels must be used only as
installation resources.
6.3
Execution
ATTENTION
Damage due to improper installation
Additional device stresses may arise due to the connection of pipes or system
equipment.
•
Ensure that pipes are connected from the device to the system without
them being stressed or strained.
•
If necessary, provide support structures for the pipes or equipment.
For installation, proceed as follows:
•
Position the device.
•
Complete the primary tank and the optional secondary tanks.
•
Create the water-side connections of the control unit to the system.
•
Create the interfaces according to the terminal plan.
•
Install the water connections between optional secondary tanks to each
other and to the primary tank.
Notice!
For installation, note the operability of the valves and the inlet options
of the connecting lines.
6.3.1
Positioning
Determine the device position.
•
Primary vessel with control unit
•
Optional secondary vessel
6.3.2
ATTENTION
Damage due to improper installation
Additional device stresses may arise due to the connection of pipes or system
equipment.
•
•
Comply with the following notes regarding the installation of the primary vessel
and the secondary vessels:
•
•
•
•
•
6.3.3
Risk of injury due to falls or stumbling
Bruising caused by falls or stumbling over cables or pipes during installation.
•
•
ATTENTION
Damage due to improper installation
Additional device stresses may arise due to the connection of pipes or system
equipment.
•
•
Reflexomat Basic — 13.11.2020 - Rev. A
Tank installation
Ensure that pipes are connected from the device to the system without
them being stressed or strained.
If necessary, provide support structures for the pipes or equipment.
All flange openings at the vessels are viewing and maintenance openings.
–
Place the vessels with sufficient distances to sides and ceiling.
Install the vessels on a level surface.
Ensure rectangular and free-standing position of the vessels.
Use only vessels of the same type and dimensions when using secondary
vessels.
Ensure proper functioning of the "LIS" level sensor.
ATTENTION Property damage caused by overpressure. Do not attach the
vessels firmly to the floor.
Connection to the facility system
CAUTION
Wear personal protective equipment (helmet, protective clothing,
gloves, safety boots).
Ensure proper installation of cables and pipes between the control unit
and the vessels.
Ensure that pipes are connected from the device to the system without
them being stressed or strained.
If necessary, provide support structures for the pipes or equipment.
Installation