Descargar Imprimir esta página

HONDA marine Assy 4.3 Manual Del Propietário página 23

Ocultar thumbs Ver también para Assy 4.3:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 142
Tank volume setting
> Tank level calibration
After finishing the tank volume setting, calibrate the set
tank level. Perform tank level calibration according to the
instructions on the screen.
1. On the screen in step 4 of "Tank volume setting" (P.21),
use the [ ∧ ] or [ ∨ ] button to select Calibration and press
the [ENTER] button.
2. Use the [ ∧ ] or [ ∨ ] button to select the number of
calibration times and press the [ENTER] button.
• To calibrate twice: Select Do 2 point cal.
• To calibrate three times: Select Do 3 point cal.
• To calibrate five times: Select Do 5 point cal.
• In this example, Do 3 point cal is selected to explain the
calibration method.
3. Make sure that the tank is empty and press the [ENTER]
button.
4. Use the [ ∧ ] or [ ∨ ] button to select YES and press the
[ENTER] button.
• When the value storage process is completed, the Value
Stored pop-up window appears.
5. Pour the fuel in half the set fuel volume and press the
[ENTER] button.
• When the tank volume is set to 500 L, pour 250 L.
6. Use the [ ∧ ] or [ ∨ ] button to select YES and press the
[ENTER] button.
• When the value storage process is completed, the Value
Stored pop-up window appears.
7. Pour the fuel up to the set volume and press the [ENTER]
button.
8. Use the [ ∧ ] or [ ∨ ] button to select YES and press the
[ENTER] button.
• When the tank level calibration is successfully completed,
the CALIBRATED pop-up window appears.
22
To "Configuring the settings" (P.8)

Publicidad

loading