Descargar Imprimir esta página

Porsche E-Performance Instrucciones De Instalación página 23

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 25
7. Do not subject the anchor rod to load during
the curing time t
.
cure
1 7
t
cure
8. When the curing time t
is reached, you
cure
can install the shaft: screw on with a torque
of max. 40 Nm.
1 8
T
inst.
Curing time t
and t
rel
cure
The curing times only apply to a dry anchorage
substrate. If the anchorage substrate is damp,
the curing times must be doubled.
1)
2)
Temp
t
rel
-5 ... -1 °C
60 min
0 ... 9 °C
30 min
10 ...19 °C
20 min
20 ... 40 °C
8 min
1)
Temperature in anchorage substrate
2)
Curing time: The screwed in embedment tools are removed
3)
Curing time: Full load
Information
The safety data sheet for the Hilti HVU anchor
capsule can be viewed online at www.hilti.com.
Appendix: Hilti Foundation Fastening Kit
Cleaning alternatives
Manual cleaning (MC)
Hilti manual blow-out pump for blowing out
drill holes.
3)
t
cure
5 h
1 h
Compressed air cleaning (CAC)
30 min
Blow-out nozzle with a minimum diameter
of 3.5 mm.
20 min
Automatic cleaning (AC)
Cleaning is carried out by the Hilti TE-CD and TE-YD
drilling system with on-board vacuum system while
drilling is in progress. This drilling system removes
drilling dust during the drilling process.
DE
EN
ES
FR
IT
JP
KO
NL
PTB
RU
ZH
ZHT
21

Publicidad

loading