Descargar Imprimir esta página

Harbor Breeze LOCHWOOD Manual Del Usuario página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

To reduce the risk of personal injury, use only the screws provided with the outlet box.
Be sure outlet box is properly grounded and that a ground wire (green or bare) is present.
Before beginning installation, carefully check all screws, bolts and nuts on fan motor assembly to
ensure that they are secured.
PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and hardware contents list. If any part is missing or damaged, do not attempt to assemble
the product.
Estimated Assembly Time: 120 minutes.
Tools Required for Assembly (not included): Electrical Tape, Phillips Screwdriver, Pliers, Safety
Glasses, Stepladder and Wire Strippers.
Helpful Tools (not included): AC Tester Light, Tape Measure, Do-It-Yourself Wiring Handbook and
Wire Cutters.
DANGER: When using an existing outlet box, make sure the outlet box is securely attached to the
building structure and can support the full weight of the fan. Failure to do this can result in serious
injury or death. The stability of the outlet box is essential in minimizing wobble and noise in the fan
after installation is complete.
CAUTION: Be sure outlet box is properly grounded and a ground wire (green or bare) is present.
After opening top of carton, remove mounting hardware package from foam inserts. Remove motor
from packing and place on carpet or on foam to avoid damage to finish.
CAUTION: Carefully check all screws, bolts and nuts on fan motor assembly to ensure they are
secured.
CAUTION
6

Publicidad

loading

Este manual también es adecuado para:

Ar17-52bnAr17-52mbkAr17-52mwh