REplaciNg thE cooliNg uNit
Apply new thermal paste all the way around the pipe.
11
12
Fit the new cooling unit into the cabinet and tighten all the
screws at the back.
13
Seal around the frame of the cooling unit (with tape or similar
material) as damp protection.
14
Replace the gas assembly.
15
Refit the heater, terminal box and the capillary tube in ex-
actly the same way they were found before.
16
Transfer the flue baffle from the old cooling unit.
17
Stand the refrigerator up and replace all screws inside the
freezer and vaccine compartment. Tighten the screws hard.
!
For proper function it is very important that good
contact between the cooling element and the cooling
unit itself is obtained.
18
Reattach the capillary tube end to the cooling element
inside the refrigerator.
19
Put the refrigerator on test.
oRDERiNg SpaRE paRtS
1
When ordering spare parts, always state:
· MODEL (found on the data plate)
· PRODUCT NO xxx xx xx-xx (found on the data plate)
· SERIAL NO xxx xxxxx (found on the data plate)
· VOLTAGE AND WATTAGE (if electric parts are ordered)
· SPARE PART DESCRIPTION (see spare parts list)
· SPARE PART NO (see spare parts list)
The data plate is located on a wall inside the cabinet.
2
3
To order spare parts log on to www.sibir.com, select contact, select your country, under select a topic
choose quotations for spare parts, fill out the form then click on send e-mail.
2
SIBIR
TYPE: RA/RM-2D
Typical data plate
www.sibir.com
MOD.NO.
V170GE
SIBIR
230 ~ Volt
INTERNATIONAL AB
TOTAL CAPACITY
BRUTTOINHALT
97
VOLUME BRUT
INPUT RATE
LEISTUNGAUFN.
EFFET AMENÉ
TESTED TO 60 bar
GEPRUFT AUF 60 bar
0402
RATIFIÉ JUSQU'À 60 bar
11
PROD.NO.
921 17 40-06
1.3 Amp
300 Watt
REFRIGERANT NH
3
170 L
KÄLTEMITTEL
NH
3
AGENT FRIORIGÉNE NH
RATING
0.48 kW
ANSCHLUSSW
37 g/h
DEBIT
GAS CATEGORY
GAS KATEGORIE
I
3 B/P
CATÉGORIE DE GAZ
Thermal paste
on pipe
SER.NO.
611 00001
CLIMATE CLASS
320 g
Na
CrO
=
2
4
3
GAS SUPPLY PRESSURE
ANSCHLUSSDRUCK
30 mbar
PRESSION DU GAZ
MADE IN SWEDEN
14
T
21 g
copyright © sibir international