3) Place the laser on a tripod or on a solid surface in front of the
wall, at a distance of approximately 2 meters.
4) Turn the device ON and activate the front vertical beam towards
the plumb line.
5) Turn the laser, so the vertical beam will merge with the
plumb line below the hanging point.
a1 x
Figure 5
19