Descargar Imprimir esta página

Helo HAVANNA 900 D Instalación Y Manual De Uso página 39

Calentador de sauna eléctrico
Ocultar thumbs Ver también para HAVANNA 900 D:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 78
Installation and User Manual
Minimum distances for the
mounting (mm)
Drill. Ø3,5 mm
Image 3 Heaters installation
2.8.2 Heater safety distances and sensor position
Absolute measure of 40mm
from ceiling
(mm)
min
20
Image 4 Heater safety distances and sensor position to wall
Figure 5. Alternative installation location
for the sensor when using the contactor
casing WE 3 and the Digi 1 or 2
control panel. Sensor OLET 19
Image 5 Sensor installation
Havanna D
280
B
OLET 19
A
475
A
min
30
K
OLET 19
Screw 6 x 40 ( 2pcs )
Screw 6 x 16 ( 2pcs )
OLET 19
(mm)
300
D
min
30
min
20
Figure 6. NOTE: Only ceiling installation when using the
control panels 1418-2-1517-3 (OT-2-PS-3) and
1418-2-1519 (OT-2-PUi).
The sensor must not be installed on the wall when using the
Havanna D Heater
Image 6 Sensor installation
8
OLET 6-1

Publicidad

loading