INSTALLING AND PROGRAMMING
1
TOOLS AND MATERIALS
Screwdrivers
Fixed wrenches (13 mm)
Saw for cutting metal
Marker pencil
Spirit level
2
INITIAL CONDITIONS AND CHECKS
Initial conditions of the door
Check that the size of the door is within the
admissible range of the operator (see the
technical features of the operator).
If the door to be automated has a personnel
door, use a safety device to prevent the
operator from operating with the personnel
door open.
Environmental conditions
This device is not suitable for installation in
inflammable or explosive environments.
Electrical power supply installation
Ensure the direct current connection and
installation fulfil the following requirements:
• The nominal voltage of the installation must
coincide with that of the control board and
be earthed.
• The installation must be able to support the
power consumed by all the automatic key
commands.
Tape measure
Electrical drill and broaches
Use the electrical drill in line with the user
manual.
Door support attachment screws
The door must be easy to manipulate manually,
namely:
• It must be balanced, in order to ensure the effort
made by the motor is minimum. The door needs to
be rebalanced after installing the operator, given the
weight of the operator and its attachment pieces.
• There should be no stiffness throughout its open/
close.
Do not install the operator in a door which
does not work correctly in manual operation,
as this may lead to accidents. Repair the door
before installing.
Check that the admissible environmental
temperature range for the operator is suitable
for the location.
• The installation must comply with low
voltage regulations and applicable rules.
• The installation elements must be properly
secured and in a good state of conservation.
ZEUS operator for up-and-over doors
English
39