Invacare SoftCloud Ace Manual Del Usuario página 15

Sistemas de colchon de aire alternante
Ocultar thumbs Ver también para SoftCloud Ace:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 117
1. Switch off the control unit and disconnect from mains
supply A.
2. Remove the mattress connector B from the control unit
and disconnect the CPR tag C.
The CPR tag can have three (3) or four (4)
connectors depending on mattress model.
3. Place control unit and power cord on top of the
mattress and detach mattress from the bed frame.
4. Once air has been released from all cells, roll up the
mattress and return all items to the carry bag for safe
keeping.
IMPORTANT!
– Always follow the correct procedure when
switching off the control unit. When the unit
is switched off, it will issue a power loss alert.
This alert can be canceled by pressing the
"ON/OFF" button for a minimum off 2 seconds.
IMPORTANT!
– Prior to restarting the system, ensure the
CPR tag is replaced and all sealing connectors
are firmly attached; and that the mattress
connector is replaced and firmly connected to
the control unit.
– Use target design to line up each plug with its
corresponding socket.
1630732-A
Setup
15

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Softcloud pro

Tabla de contenido