Place the middle section [ 5 ] with the
clamps [ 9 ] on the bottom section [ 7 ]
(3).
Remove [ 9 ] clamps (4).
Insert the middle section [ 5 ] into the
bottom section [ 7 ] . Place the holes
over the stud bolts [ 11 ] .
Connect the screw joints
[ 11 ] , washer [ 3 ] and nut [ 2 ] ).
IMPORTANT
Repeat the steps for the additional middle
section of nominal size 22.5.
Pull the sealing ring [ 4 ]
of the upper section [ 1 ] (5).
spigot
Fix the sealing ring [ 4 ] with clamps
[ 9 ]
(distributed around the
circumference) to the bead
upper section [ 1 ]
LipuJet - P -RB / - RD / - RM / - RA / - RAP
(stud bolt
over the
of the
(6).
Installation
3.
4.
5.
6.
67/ 454