Commissioning the Inverter

Requirements:
☐ The circuit breaker must be correctly rated.
☐ A means of disconnecting the inverter from the PV array must be present.
☐ The inverter must be correctly mounted and closed.
☐ All cables must be correctly connected to the terminals.
☐ Unused openings for the DC connection in the inverter enclosure must be closed with UL-listed
type 3R filler plugs.
☐ Unused openings for the Ethernet connection or the communication connection in the inverter
enclosure must be sealed tightly. The factory-mounted filler plugs can be used for that purpose.
Procedure:
1. Make sure that the AC cable is routed so that it cannot be damaged by the partition in the
lower enclosure lid.
2. Insert the lower enclosure lid from above and flip it
down. Make sure that the ribbon cable of the
communication assembly is not clamped and that
the screws must protrude from the lower enclosure
lid.
3. Tighten all six screws with an Allen key (AF 3) in the
order 1 to 6 (torque: 2.0 Nm (17.7 in-lb)). Make
sure that the ribbon cable of the communication
assembly is not clamped. By tightening the screws
in the prescribed order, you avoid warping the
enclosure lid, which would keep it from sealing
correctly.
Useful hint: If the screws fall out of the lower
enclosure lid, insert the long screw into the lower
middle hole and the five short screws into the other
holes.
Installation Manual
7 Commissioning the Inverter
STPTL-US-10-IA-xx-20
37