Piusi MA 130 Instrucciones De Uso Y Mantenimiento página 57

Bombas de membrana
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 109
O
COMMISSIONING
The user must always use materials that are compatible with the pumped liquid
according to the pump's design conditions.
WARNING
To commission the pump, proceed as follows:
1. Make sure that the product delivery and intake hoses are correctly connected -
check the signs on the pump:
"IN" = INTAKE (down) and
"OUT" = DELIVERY (up)
2. Check that the pump's pneumatic circuit valves are correctly installed (on-off ball
valve, three-way valve and check valve).
3. Open the fluid intake and delivery valves.
OUT
IN
1
6
it is forbidden to use the pump with fluids that are
not compatible with the pump's construction mate-
rials or in a place that contains incompatible fluids.
2
7
3
57/208
EN

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido