Batteries Installation
Your meter kit comes with two AAA, 1.5volt, batteries uninstalled. New set of batteries will provide power to perform about
1000 tests under normal use. The low battery symbol "
low. Please keep spares on hand and replace the batteries soon when a battery symbol appears.
The meter will automatically turn off after 3 minutes of nonuse to save battery power. Your test memories are still saved.
1. Turn the meter over.
2. Install both batteries at once.
Press and push battery
Be sure to put battery in
cover to open.
correct direction.
20
" will keep appearing on your display if your batteries run
3. Slide the battery cover back
until it snaps into place.
4. Meter will do electronic runing-test and the whole screen will keep blinking as soon
as the batteries are installed.
5. Press any button to close the running-test of the meter, and enter setting mode.
6. Please set time and date when the batteries are replaced. See Setting the Time,
Date and Unit on page 23.
PRECAUTION
- Danger of explosion might happen if battery is incorrectly replaced; replace only with the same or equivalent
type.
- Please follow the local regulation and discard used battery properly.
Batteries Installation
21