CONTROLLO ZONE FZ4B
One mixed zone and two direct zones
Schematic diagram
Use 3-wire mixing valves:
- OPENING PHASE 230V
- CLOSING PHASE 230V
- NEUTRAL.
with switching times (from all closed to all open) of not more
than 180 seconds.
Electrical connections
After installation, carry out the necessary electrical connections as shown in the wiring diagram.
Then confi gure the controller as described in the specifi c section.
RY1
RY2
7 (L)
8 (N)
9 (L)
10 (N)
318a
318a 315a - A 315a - B 315a - C
318a
318a 315a - A 315a - B 315a - C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A B
317a
318a
315a
To manage the sliding temperature it is necessary to purchase the external probe accessory code 013018X0
74
RY3
RY4
RY5
11 (L)
12 (L)
13 (L)
14 (N)
318b
318c
318b/318c
318b
318c
318b/318c
FZ4B
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
C
72a
139a
318b
318c
315a
M
317a
319a
318a
a
72a/139a
fi g. 18
RY6
RY7
RT1
15 (L)
16 (L)
19 - 20
72a/139a 72b/139b 72c/139c
72a/139a 72b/139b 72c/139c
72c
138
72b
319a
139c
139b
IMPIANTO
fi g. 19
CALDAIA
318b
318c
b
c
72b/139b 72c/139c
RT2
RT3
T1
T2
21 - 22
23 - 24
25 - 26
27 - 28
319a
319a
72a 1st zone (mixed) room thermostat
72b 2nd zone (direct) room thermostat
72c 3rd zone (direct) room thermostat
138 External probe
139a 1st zone (mixed) Remote Timer Control
139b 2nd zone (direct) Remote Timer Control
139c 3rd zone (direct) Remote Timer Control
315a 1st zone (mixed) mixing valve
A = OPENING PHASE
B = NEUTRAL
C = CLOSING PHASE
317a 1st zone (mixed) safety thermostat
318a 1st zone (mixed) circulating pump
318b 2nd zone (direct) circulating pump
318c 3rd zone (direct) circulating pump
319a 1st zone (mixed) delivery sensor
a 1st zone (mixed)
b 2nd zone (direct)
c 3rd zone (direct)
____ Necessary wiring
- - - - Optional wiring
EN
T3
T4
29 - 30
30 - 31
138