One Mixed Zone And One Hot Water Tank - No External Sensor - Gruppo Ferroli FZ4B Instrucciones De Uso E Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

CONTROLLO ZONE FZ4B
Pump phase or Valve (RY4)
12
Pump phase or Valve (RY5)
13
Pump neutral or Valve (RY5)
14
Pump neutral (RY7)
14
Pump phase (RY7)
16
On/Off Thermostat or Remote Control (RT1)
19
On/Off Thermostat or Remote Control (RT1)
20
On/Off Thermostat or Remote Control (RT2)
21
On/Off Thermostat or Remote Control (RT2)
22
On/Off Thermostat or Remote Control (RT3)
23
On/Off Thermostat or Remote Control (RT3)
24
NTC sensor (T2)
27
NTC sensor (T2)
28
NTC sensor (T4)
30
NTC sensor (T4)
31
Card SK connected
X15
The algorithm remains the same as the confi guration: 5.22 "THREE Direct Zones and ONE Hot water tank – No External Sensor".
What changes is only the calculation of Zone1 Heating Setpoint, Zone2 Heating Setpoint and Zone3 Heating Setpoint if the sliding temperature was activated in one or
more zones.
5.24 "ONE MIXED ZONE AND ONE HOT WATER TANK – NO EXTERNAL SENSOR"
Autoconfi guration:
Connection
Description
Pump phase (RY1)
7
Pump neutral (RY1)
8
Mixing Valve Opening phase (RY2)
9
Mixing Valve neutral (RY2)
10
Mixing Valve Closing phase (RY3)
11
Pump neutral (RY7)
14
Pump phase (RY7)
16
On/Off Thermostat or Remote Control (RT1)
19
On/Off Thermostat or Remote Control (RT1)
20
NTC sensor (T1)
25
NTC sensor (T1)
26
NTC sensor (T2)
27
NTC sensor (T2)
28
Card SK connected
X15
5.24.1 On/Off Thermostat
The algorithm of the Mixed Zone remains the same as the confi guration: 5.7 "ONE Mixed Zone – No External Sensor".
The algorithm of the Hot water tank remains the same as the confi guration: 5.17 "ONE Hot water tank".
What changes is:
a. DHW has priority over Heating: the Hot water tank Priority parameter (TSP25) is equal to 0.
During DHW mode, the algorithm of the Hot water tank has the highest priority.
During DHW mode, the zone request (if occurring) must be stopped without doing post-circulation and the mixing valve must be controlled in closing for the entire
duration of the Mixing valve closing Time timer (TSP31). If DHW mode ends before the end of the Mixing valve closing Time timer (TSP31), the timer must be reset,
because at the end of DHW mode the zone request (if occurring) must restart with the normal algorithm.
b. DHW does not have priority over Heating: the Hot water tank Priority parameter (TSP25) is equal to 1.
In case of simultaneous request, the Zone card Heating Setpoint is equal to the higher of the two: Zone1 Heating Setpoint and Hot water tank Primary Setpoint
(TSP23).
If the circuit (Heating or Hot water tank) that ends the request has the higher Setpoint, the Zone card Heating Setpoint must be immediately decreased until it is equal
to the Setpoint of the circuit (Heating or Hot water tank) still in request status.
If the circuit (Heating or Hot water tank) that starts the request has a higher Setpoint than the circuit already in request status, the Zone card Heating Setpoint must
be immediately increased until it is equal to the higher Setpoint of the circuit (Heating or Hot water tank) in request status.
c. Each zone has its own adjustment parameters.
d. Post-circulation time
During DHW mode, if the pump of the zone is doing post-circulation, the latter must be stopped whereas the mixing valve must be controlled in closing for the entire
duration of the Mixing valve closing Time timer (TSP31). At the end of DHW mode, post-circulation must not restart.
5.24.2 Remote Control
The algorithm of the Mixed Zone remains the same as the confi guration: 5.7 "ONE Mixed Zone – No External Sensor".
The algorithm of the Hot water tank remains the same as the confi guration: 5.17 "ONE Hot water tank".
What changes is:
a. DHW has priority over Heating: the Hot water tank Priority parameter (TSP25) is equal to 0.
During DHW mode, the algorithm of the Hot water tank has the highest priority.
96
Direct zone 2
Direct zone 3
Direct zone 3
Hot water tank
Hot water tank
Direct zone 1
Direct zone 1
Direct zone 2
Direct zone 2
Direct zone 3
Direct zone 3
Hot water tank probe
Hot water tank probe
External probe
External probe
Mixed zone 1
Mixed zone 1
Mixed zone 1
Mixed zone 1
Mixed zone 1
Hot water tank
Hot water tank
Mixed zone 1
Mixed zone 1
Mixed zone 1 delivery
Mixed zone 1 delivery
Hot water tank probe
Hot water tank probe
EN

Publicidad

Tabla de contenido
loading

Productos relacionados para Gruppo Ferroli FZ4B

Tabla de contenido