Decommissioning the Inverter

To decommission the inverter completely upon completion of its service life, proceed as described
in this Section.
Risk of injury when lifting the inverter, or if it is dropped
The inverter weighs 26 kg (57.32 lbs). There is risk of injury if the inverter is lifted incorrectly or
dropped while being transported or when attaching it to or removing it from the wall mounting
bracket.
• Transport and lift the inverter carefully.
Procedure:
1.
Danger to life due to high voltages
• Disconnect the inverter from all voltage sources (see Section 8, page 60).
2. Remove the DC conductor from the fuses for the DC connection.
3. Remove the AC conductors from the AC-out terminal block. To release the conductors from the
terminals, open the terminals with a flat-blade screwdriver (blade width: 4 mm (
4. Screw out the screws from the AC-out terminal block using a flat-blade screwdriver (blade
5
width: 4 mm (
/
 in)) and pull the terminal block out of the slot.
32
5. Remove all connection cables from the jacks located
on the interface module of the battery.
6. Remove all equipment grounding conductors from the equipment grounding terminals. To do
this, remove each screw with a Torx screwdriver (TX 25) and remove the equipment grounding
conductor from the inverter; screw each screw back in with a Torx screwdriver (TX 25).
7. Remove the network cables from the jacks of the
communication assembly.
8. Remove all conduits with conductors from the inverter. To do this, screw the conduit fittings out
of the enclosure openings from the inside.
Installation Manual
CAUTION
DANGER
FCC ID: SVF-KP20
IC: 9440A-KP20
A
B
Max. 30V DC
USB
SBSxx-US-10-IA-xx-11
9 Decommissioning the Inverter
5
/
 in)).
32
ANT.
A
B
D-IN
SPS
D - I N
S P S
61

Publicidad

Tabla de contenido
loading

Tabla de contenido