it from falling and getting damaged.
Assemble the different parts of the ma-
chine (Fig. 2):
- Remove the side cover.
- Insert the air pipe G, into hole A behind
the column tilting cylinder.
- Assemble head 1, insert pin B into hole C
and lock it with the screw and washer D.
- Insert pin E into hole F and in the U-bolt
F1 of the column tilting cylinder and lock
it with ring M.
- Connect pipe G to the intermediate union
connected to the column lifting valve H.
- Assemble the box with pressure gauge
3 on column 1 and lock it with the screw
and washer S.
36
S
G
B
D
G
H
- Assemble the column guard 2 and lock
it with the screws and washers L.
- Fit the hose connector of the tank 4 into
hose Q, fasten the tank 4 to the machine with
nuts and washers R, and tighten the clamp
O onto the hose Q (TI version only).
- Open the bead breaker arm Z.
- Insert the spacer pad U on the bead breaker
cylinder pin V, re-close the bead breaker
arm by making the bead breaker cylinder
pin pass through the adjustable block.
- The T nut is to be screwed on to bead
break cylinder pin V only when the ma-
chine is installed and hooked up to the
compressed air line. Tighten the nut T
until P is 3-4mm.
V
U
Z
P
L
M
E
R
A
F
D
F1
Q
O
Operator's manual A 2025 LL
T
2