Transporting The Boom - Greenlee G10 Tugger Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Transporting the Boom

Wheeling
1. If the unit had been set up for an up pull:
a. Lower the nose to the oor to get to the Teepee
transport position.
b. Lock the elbow pivot detents in the inward
position.
c. Raise the boom by cranking until the nose is off
the oor, and release the detents.
If the unit had been set up for a down pull:
a. Release the elbow pivot detents, fold the
forward boom back to the next to last position,
and lock the elbow.
b. Raise the boom all the way up until it hits the
stop.
c. Release the ring pull detent that locks the back
boom to the elbow, and rotate the elbow 180°
into its Teepee position.
2. Lift the push/pull handle up until it contacts the
boom mount to push the carriage. Use the same
handle to pull the unit.
Handle raised
for pulling
Handle Position for Pushing
Handle raised
Handle raised
for pulling
for pulling
Handle Position for Pulling
3. Fold the handle down on top of the puller head
when not in use to keep it out of the way.
Greenlee Tools, Inc.
G10 Tugger™ Portable Cable Puller
Lifting
1. Connect a lifting sling to the top puller head
mounting pin.
2. Feed the sling up between the sheave and frame of
the elbow so that it is trapped.
3. Lift the sling from above the elbow.
Sling
19
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070

Publicidad

Tabla de contenido
loading

Tabla de contenido