4.5 - CONDOR 500 / CONDOR 500 S - connection diagram of the motors
Configuration with delayed opening of the MOTOR no. 2
CONDOR 500
Main menu - LED L1 DELAY, LED OFF = MOTOR DELAY OF MOTOR NO.2
Configuration with delayed opening of the MOTOR no. 1
1
CONDOR 500
Main menu - LED L1 DELAY, LED ON = MOTOR DELAY OF MOTOR NO.1
Wire connection of motors to control unit (capacitor to be wired between the two phases)
OPEN
with OP1
COMMON
with CM1
CLOSE with CL1
CONDOR 500 S
1
2
CONDOR 500 S
OPEN
with OP2
COMMON
CLOSE with CL2
CN1
F1
with CM2
COMUNELLO ®Copyright 2019 - All rights reserved
4
C
M
2
C
M
M
C
M
R
B
27