Required Settings In The Heat Pump Domestic Hot Water Cylinder; Overview Of The Event Messages And Troubleshooting; Event Messages And Troubleshooting - Vaillant VPV I Serie Instrucciones De Funcionamiento

Ocultar thumbs Ver también para VPV I Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Appendix
D.2.1 Required settings in the control
Multi-funct. Input: PV
D.2.2 Required settings in the heat pump domestic hot water cylinder
PV MODE: ECO
E

Overview of the event messages and troubleshooting

E.1

Event messages and troubleshooting

If a fault cannot be eliminated using the following table, contact Customer Service.
Event message
Data transfer failed
Grid islanding detected
FE not connected
Residual current too
high
Boost converter mal-
function
Device overheated
Boost converter has
wrong HW version
Boost converter not
connected
Intern. info.
Intern. warning
Intern. error
44
Symbol
Cause
A setting has failed because it was not trans-
ferred correctly.
The network carries no voltage (inverter
stand-alone operation).
For safety reasons, the inverter must not
feed into the network.
The inverter switches off while the fault
is present (display is dark).
The functional earth is not connected.
For safety reasons, the inverter must not
feed into the network.
The residual current that flows from the plus
or minus input via the PV generators to earth
exceeds the permitted value.
Due to legal regulations, the inverter
automatically switches off while the fault is
present.
An internal component in the inverter is
defective.
The inverter does not feed into the network
or feeds in with reduced power.
Despite the reduction in output, the max-
imum permissible temperature has been
exceeded.
The inverter does not feed into the network
until the permissible temperature range has
been reached.
The inverter cannot detect an internal com-
ponent or it does not match the other com-
ponents.
The inverter does not feed into the network.
The connection for the internal components
has been interrupted.
The inverter does not feed into the network.
Measure
Implement the setting again.
Check the alternating current installation
(utility connection):
Check the circuit breaker (fuse) and, if
required, switch it on.
Check the residual-current circuit
breaker and, if required, switch it on.
Replace the defective switch.
Ensure that the alternating current in-
stallation (utility connection) is working.
Ensure that the protective conductor is
connected correctly.
Ensure that none of the direct current
cables are earthed.
Ensure that only suitable photovoltaic
modules are used.
Ensure that the direct current installation
is working.
Use a suitable analyser to ensure that
the photovoltaic generator is working
correctly.
See measures on Intern. info..
See measures on Intern. info..
See measures on Intern. info..
See measures on Intern. info..
Contact customer service.
If required, replace the inverter.
See measures on Intern. info..
See measures on Intern. info..
Installation and maintenance instructions VPV I 0020273427_02

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Vpv i 1500/2Vpv i 2000/2Vpv i 2500/2Vpv i 3000/2Vpv i 4000/2

Tabla de contenido