Wiring; Installation Wiring Notes - Mitsubishi AL2 Serie Manual De Hardware

Ocultar thumbs Ver también para AL2 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 292
α
2 Simple Application Controllers
4.

Wiring

4.1

Installation Wiring Notes

The wiring of
trained in the local and national electrical standards should perform all tasks associated
with the electrical wiring of the
performing any wiring operations.
• Input and output cables should not be run through the same multicore cable or share the
same wire.
• Do not lay input/output cables near high voltage power cables.
• Input and output cable length must be than 30m (98' 5").
Allow for voltage drop and noise interference with input/output lines used over an extended
distance. Please use wire that is properly sized for the current load.
The terminal will accept a 3 mm flathead screwdriver.
α
2 Series has been designed to be safe and easy. A technician or engineer
α
2 Series controllers. Turn OFF the Power before
Wiring 4
ENG
ENG-17

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Al2-14mr-aAl2-14mr-dAl2-24mr-aAl2-24mr-d

Tabla de contenido