15.
INSTALATION AND STORAGE OF THE MACHINE
15.1. INSTALATION AND STARTING THE MACHINE
The installation and starting of the machine will be done by the service technicians of Merand or
by personal authorized.
In case the machine has to be moved, the machines will have to be lifted always by a lifting cart
o transportation cart.
Never drag the machine to move it!
Situate the machine perfectly centred and levelled.
The general electrical connection of the machine will be done at the terminal strip situated at the
electric square marked GND N R S T with a hose of 5 x 2.5mm.
For more details consult the electric diagram.
15.2. STORAGE OF THE MACHINE
In case that the machine has to be a long time without use, it's important to observe the
following recommendations:
- Clean perfectly the machine of left over's of mass or flower.
- Keep in a place without humidity or extreme temperatures
- Cover the machine with a plastic to protect it from dost and dirt.
- Disconnect de electrical feed.
- Don't let any paced mould in the guillotine.
- Protect the moulds with a light cap of oil SAE 40
Page 30