en
5. Drill four holes (Ø10mm) and insert dowels
for M8 hanger bolts
6. Screw the hanger bolts into the dowel until
approx. 20mm protrude. Immediately screw
the nuts onto the hanger bolts for standard
towers (with quick installation flange).
7. Guide the exhaust air hose (extraction
mode) and the electric cable down from
the ceiling. The exhaust air hose should be
approximately 10cm longer than the upper
tower.
8. Push the upper tower over the exhaust air
hose and electric connecting cable -then fas-
ten the upper tower to the ceiling using
washers and nuts or using the quick mounting
flange. (Special tool type TZ 1000 item no.
55999800)
9. Slip the lower tower over the upper tower
and fix using adhesive tape.
10. Fasten the exhaust air hose to the
extractor hood, making sure that the hose is
not bent.
11. Make the electrical connection. If using
an external blower motor, connect the
connecting cable. Connect the supply cable
between the LED power display and the motor
module.
12. Determine measurement (X-Y), X =
distance between hob and ceiling, Y =
distance between hob and hood