Descargar Imprimir esta página

Pentair Raychem E-100-A Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

4A
• Lightly score outer
jacket around and
down as shown.
• Bend heating cable
to break jacket at the
score, then peel off
jacket.
• Remove all exposed
braid.
• Lightly score inner
jacket around and
down as shown.
(13 mm)
• Bend heating cable
to break jacket at the
score then peel off
jacket.
• Un-wind heating
element, cut and
remove as shown.
• Lightly score and
remove clear jacket.
• Cut one bus wire.
INDUSTRIAL HEAT TRACING SOLUTIONS
VPL
1 1/8 in
(28 mm)
1/2 in
1/4 in
(6 mm)
Go to Step 5
EN-RaychemE100Aendseal-IM-H55400      02/15
4B
BTV and QTVR
XTV and KTV
• Lightly score outer
jacket around and
down as shown.
• Bend heating cable
to break jacket at
the score, then peel
off jacket.
• Remove all exposed
braid.
1 1/4 in
(32 mm)
Go to Step 5
3 / 6

Publicidad

loading