GB
2.7 ELECTRICAL CONNECTION
This procedure should be performed by an electrical
technician (in compliance with the current local
regulations of the country where the display unit is
installed).
Carry out the electrical connection procedure in
accordance with the system diagram.
CAUTION!
The disconnection switch (main switch)
(Fig. 11 ) must be installed by an electrical
technician in compliance with current
local regulations.
2.8 NOTES ON THE ENVIRONMENT
- Packaging
Do not discard any elements of the counter
packaging, but separate it according to the type of
material used (cardboard, wood, steel, polyester,
etc...) and dispose of these elements in accordance
with current legislation in the country where the
counter is operated.
- Disposal
When the counter can no longer be used, proceed
as follows:
Collect all the refrigerant from the circuit, drain all
the oil contained within the appliance for any reason,
remove all rubber parts (e.g. O-rings, seals) and
send it to be scrapped.
2.9 ACCESSORIES
The following should be considered as accessories
and are supplied on request:
- Scoop washer
- Set of tubs 360x165 mm, h = 120-150 mm.
- Set of tubs 360x250 mm, h = 120-150 mm.
- Condensate collector tray.
39
Fig.11