Installation Check-Up; Hot Water - LaCimbali S39 Dolcevita 2 Manual De Instalacion Y Uso

Ocultar thumbs Ver también para S39 Dolcevita 2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 115
WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C).
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
COFFEE CIRCUIT / MILK CIRCUIT
Keep the coffee circuit wash key (26)

HOT WATER

Continuously dispense hot water until at least 2 liters of water have been dispensed.
STEAM (also with Turbosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
02_S39DV2.indd 5

5. Installation Check-up

pressed for a few seconds.
5 EN
18/06/2014 15:15:26

Publicidad

Tabla de contenido
loading

Tabla de contenido