NTC heating outlet fault
Heating outlet probe over-temperature
Outlet/return line probe differential alarm
NTC heating return line fault
Heating return line probe over-temperature
Outlet/return line probe differential alarm
Cleaning the primary heat exchanger
NTC flue gases fault
Flue gases probe over-temperature
Parasite flame
Low temperature system thermostat alarm
Temporary pending ignition
Water pressure switch intervention
Calibration service
Calibration installer
Chimney sweep
Vent cycle
Pre-heating enabled
Preheating heat request
External probe presence
Domestic water heat request
Heating heat request
Antifreeze heat request
Flame present
To restore operation (reset alarms):
Faults A 01-02-03
Set the mode selector to
it to the desired position
attempts do not reactivate the boiler, request the intervention of the
Technical Assistance Centre.
Fault A 04
In addition to the fault code, the digital display displays the symbol
.
Check the pressure value indicated by the water gauge:
if it is less than 0.3 bar, position the function selector on
adjust the filling tap until the pressure reaches a value between 1
and 1.5 bar.
"Then position the mode selector to the desired position
mer) or
(winter).
The boiler will carry out a venting cycle lasting about 2 minutes.
If pressure drops are frequent, request the intervention of the Tech-
nical Assistance Centre.
Fault A 06
The boiler functions normally but does not guarantee a constant do-
mestic hot water temperature, which remains set at around 50°C.
Contact the Technical Assistance Centre.
Fault A 07
Contact the Technical Assistance Centre.
Fault A08
Contact the Technical Assistance Centre.
Fault A09
Set the mode selector to
it to the desired position (summer) or (winter). If the reset attempts
(OFF), wait 5-6 seconds and then return
(summer) or
(winter). If the reset
(OFF), wait 5-6 seconds and then return
A07
A08
A09
A11
A77
80°C flashing
flashing
ADJ
ACO
P
P flashing
60°C
80°C
do not reactivate the boiler, request the intervention of the Technical
Assistance Centre.
Fault A09
The boiler is equipped with an auto-diagnostic system which, based
on the total number of hours in certain operating conditions, can sig-
nal the need to clean the primary exchanger (alarm code 09 with flue
gases probe counter >2,500).
Once the cleaning operation has been completed, reset to zero the
total hour meter with special kit supplied as an accessory following
procedure indicated below:
disconnect the electrical supply;
OFF and
remove the shell and turn the instrument panel;
remove the electrical parts inspection cover, undoing the 2 fixing
screws;
(sum-
as you electrically power the boiler press the CO button for at least 4
seconds to check that the counter resets. Remove and restore pow-
er to the boiler; on the display the counter is shown after the "-C-"
indication.
Live electrical parts (230 Vac).
NOTE
The meter resetting procedure should be carried out after each in-
depth cleaning of the primary exchanger or if this latter is replaced.
To check the status of the totalled hours multiply the value shown by
100 (ex: shown value of 18 = pre totalled 1800 – shown value of 1=
totalled hours 100). The boiler continues to operate normally even
with the alarm active.
Fault A77
The fault is self-resetting, if the boiler does not restart contact the
Technical Assistance Centre.
Mynute Green E C.S.I.
Temporary stop
Temporary then definitive
Definitive lockout
Temporary stop
Temporary then definitive
Definitive lockout
Signal
Temporary stop
Temporary then definitive
Temporary stop
Temporary stop
Temporary stop
Temporary stop
Signal
Signal
Signal
Signal
Signal
Signal
Signal
Signal
Signal
Signal