EN
E-PAK 150 DX/300 DX/500 DX
Table 6-1: Accessory terminals
Terminal
1–2
3–4
5–6
9–10
11–12
23–24
25–26
7
Before installation
WARNING!
Always use proper lifting and protective equipment.
WARNING!
Consider the centre of gravity and attachments during transport.
NOTE!
installation process.
NOTE!
'Appendix A: Installation protocol'.
NOTE!
E-PAK 150 DX/300 DX/500 DX.
7.1
Delivery checks
Check the unit for any transport damage. In case of damage or parts missing,
notify the carrier and your local Nederman representative immediately.
7.2
Installation requirements
7.2.1
Location and risk area
Prepare the location where E-PAK 150 DX/300 DX/500 DX is to be placed
before installation.
NOTE!
space above the top to facilitate replacing of the main and control filters.
NOTE!
bin and control filter, see Figure 3.
7.2.2
Foundation
The unit is to be anchored to a hard, level and firm foundation, such as a
reinforced concrete foundation.
Consider the following when calculating the foundation or supporting
structure:
•
The total weight of E-PAK 150 DX/300 DX/500 DX with accessories, see
Section '5.3 Technical and electrical data').
•
Traction forces generated by explosion relief venting, see Section 7.2.3
Bolts.
•
Max. weight of the collected material.
32
Accessory/function description
Permanent 24 V AC of external equipment
Pilot signal
Remote start/stop
Compressed Air Switch (CAS)
External emergency stop
Remote run indicator
Remote alarm output (red fault indicator light)
Risk of personal injuries.
Risk of tipping.
Always follow local regulations and legislation for all steps of the
Fill in the installation protocol during installation, see
Make a layout for the entire system before installing
E-PAK 150 DX/300 DX/500 DX needs approximately 1.0 m of free
Keep the area around the unit free to facilitate access to the collector