Preparing For Installation - Signature Kitchen Suite SKSDR360GS Manual Del Propietário

Ocultar thumbs Ver también para SKSDR360GS:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

16 INSTALLATION

Preparing for Installation

Tools Needed
Phillips screwdriver
Level
Pipe wrench (2)
(one for support)
Parts Provided
Template (1)
Anchor sleeves (6)
Front rail (1)
Materials You May Need
Gas line shut-off valve
Pipe joint sealant that resists action of natural and LP gases
Flexible metal appliance connector (
Never use an old connector when installing a new range.
Flare union adapter for connection to gas supply line (
Flare union adapter for connection to pressure regulator on range (
Liquid leak detector or soapy water
Lag bolt or
/
" O.D. sleeve anchor (for concrete floors only)
1
2
Flat-blade screwdriver
Open-end or
adjustable wrench
Tape measure
Anti-tip bracket kit (1)
Lag bolts (6)
/
" or
/
" NPT x
3
1
4
2
1
/
" Nut driver
4
Drill
Safety glasses
Gloves
Parts not Provided
4-wire or 3-wire cord and
strain relief kit
(UL approved 40 or 50 AMP)
Leg cover (2 sets)
/
" I.D.)
1
2
3
/
" or
1
/
" NPT x
1
/
" I.D.)
4
2
2
1
/
" NPT x
2
Pliers
Dolly
Strain relief
(For conduit
Installations only)
Screws (7)
(Leg cover, Front rail)
1
/
" I.D.)
2

Publicidad

Tabla de contenido
loading

Tabla de contenido