Figure 4 Permanent-Mount Beacon (Exploded View) - Federal Signal Spire 200 Instrucciones De Instalación Y Mantenimiento

Ocultar thumbs Ver también para Spire 200:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

DRILLING PRECAUTIONS: Before drilling holes, check the area
into which you plan to drill to ensure that you do not damage
vehicle components while drilling. All drilled holes should be
deburred, and all sharp edges should be smoothed. All wires
going through drilled holes should be protected by a grommet or
convolute/split-loom tubing.
3. Drill a suitably sized hole at the scribed position for the
bushing and wire routing hole. Otherwise, route the wires
through the drain notch in the optional mounting flange.
Leave open space for water to drain.

Figure 4 Permanent-mount beacon (exploded view)

Spire
200 Beacon
Federal Signal www.fedsig.com
Installation and Maintenance Instructions
13

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido