INSTALLATION

• Support Installation

1. determine primary direction of product
flow. figure 4A indicates the preferred flow
as related to the drive.
2. Refer to "match-mark" numbers on ends
of conveyor sections. (figure 4A) Position
them in this sequence near the area of
installation.
3. Attach supports to both ends of drive
section and to one end of intermediate
or tail sections (figure 4A). Hand tighten
bolts only at this time. Conveyors angle
of incline will determine where the knee
brace mounting brackets are to be placed
when required.
4. Adjust elevation to required height.

• Ceiling Hanger Installation

If conveyors are to be used in an overhead application, ceiling hangers may
have been supplied in place of floor supports.
figure 4B shows how a ceiling hanger mounts to a conveyor section.
Ceiling hangers should be mounted at section joints. for safety informa-
tion concerning conveyors mounted overhead, refer to "Installation Safety
Precautions" on Pg 3.
NOTE: When installing ceiling hanger rods in an existing building, all
methods of attachment must comply with local building codes.
CEILING HANGER ROD
(VarIlla de sOpOrte a teCHO)
SIDE CHANNEL
(Canal lateral)
PIPE RETAINER
(abrazadera)
MOUNTING BOLTS
(tOrnIllO de mOntaJe)
FIGURE 4A
(Figura 4a)
TAIL SECTION
(SECCIÓN DE RETORNO)
2"
ADJUST TO
DESIRED ELEVATION
(AJUSTE A LA
ELEVACIÓN DESEADA)
FIGURE 4B
(Figura 4b)
SPACER
(espaCIadOr)
JAM NUT
(COntra tUerCa)
SUPPORT PIPE
(tUbO de sOpOrte)
JAM NUT
(COntra tUerCa)
LOCK BOLT
(tOrnIllO CandadO)
FLOW
(FLUJO)
INTERMEDIATE SECTION
(SECCIÓN INTERMEDIA)
A
A
CONVEYOR
CONVEYOR
1
2
2
1
ITEM
TO
ITEM
TO
HYTROL CONVEYOR CO. INC.
HYTROL CONVEYOR CO. INC.
JONESBORO, AR
JONESBORO, AR
"MATCH-MARK" NUMBERS
(ETIQUETAS DE SECUENCIA DE ARMADO)

• Conveyor Set-Up

1. mark a chalk line on floor to locate center of the conveyor (floor mounted
Conveyors).
2. Place the drive section in position.
3. Install remaining sections placing end without support on extend pivot plate
of previous section (figure 4A). Check "match mark" Numbers to see that
adjoining sections are in proper sequence
4. fasten sections together with butt couplings and pivot plates (figure 4C).
Hand tighten bolts only.
5. Check to see that conveyor is level across width and length of unit. Adjust
supports and ceiling hangers as necessary.
6. Install electrical controls and wire motor.
FIGURE 4C
(Figura 4C)
SIDE CHANNEL
(Canal lateral)
MOUNTING BOLT
(tOrnIllO de mOntaJe)
FIGURE 4D
(Figura 4d)
DRIVE SECTION
(seCCIón mOtrIz)
MATCH MARKS
(etIQUetas de
seCUenCIa de armadO)
4
PRODUCT FLOW
(FLUJO DEL PRODUCTO)
DRIVE SECTION
TAIL SECTION
(SECCIÓN MOTRIZ)
(SECCIÓN DE RETORNO)
4"
SIDE CHANNEL
(Canal lateral)
BUTT COUPLINGS
(plaCas de UnIón)
PIVOT PLATE
(base sUperIOr del
sOpOrte)
STATIONARY SUPPORT
(sOpOrte estaCIOnarIO)
ACC
INTERMEDIATE SECTION
OR TAIL SECTION
(seCCIón IntermedIa O
seCCIOn de retOrnO)
"MATCH-MARK"
NUMBERS
(etIQUetas de
seCUenCIa de
armadO)
LRC
CENTER SUPPORT
(sOpOrte Central)
END GUARD
(gUarda del eXtremO)
2"

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

190-lrc190-lrs190-lrss

Tabla de contenido