FAStENiNGS
ax4
bx4
cx2
tooL REQUiRED
PARtS
A
Bx2
Cx4
Dx4
ASSEMBLy
FAStENiNGS
dx4
B
1
B
b
a
A
2
3
4
C
C
aSic
orner
ASSEMBLy
1
Position the 4 dowels (b) in the sides (B).
Fit the rack (A) onto the 4 dowels (b).
Push the 4 screws (a) into the rack and screw
together the assembly.
ASSEMBLy
2
Position the 2 dowels (c) in the pedestal
module. Fit the two sides onto the pedestal
module.
c
3
When the 2 modules are back to back, you
will need to link them using 4 linking screws (d).
Push the linking screws into the holes provided
d
in the shelf support strips on the 2 contacting
panels. Tighten until the 2 panels are in contact
and correctly aligned.
BottLE StoRAGE
4
Position the 4 rack supports (C) in the shelf
support strips and locate the rack (A). Position
the 2 bottle stops (D) at either end of the rack
(widest part).Then insert your first row of 4
bottles in the rack slots, followed by a series of
A
5 bottles.
D
M
(
16)
odule
mv
7
GB