2. Mount cable glands and route cables:
Warning
Not using round cables for installation and mounting the sealing nuts of the cable glands
incorrectly will affect the protection against moisture of the wallbox, which can result in
the risk of electric shock.
▶ Use round cables for installation.
▶ Make sure that the sealing nuts are mounted on the outside of the wallbox.
a. Remove the lock nuts from the cable glands and mount the cable glands on the
power supply cable and (optionally) on the CT coil cable and Ethernet cable with
their sealing nuts on the outside of the wallbox.
b. Insert the supply cables from the back of the wallbox through the cable opening of
the main assembly.
c. Make sure the following lengths of cables are available after the cable glands, then
tighten each cable gland.
▶ Power supply cable: > 180 mm.
▶ CT coil cable (optional): > 80 mm.
▶ Ethernet cable (optional): > 400 mm.
d. Secure the cable glands by tightening their lock nuts.
5.3 Mount main assembly onto wall bracket
B
5.3
See the corresponding illustrations in manual B.
1. Engage the top edge of the main assembly with the top of the wall bracket and
then rotate the main assembly so it is flat on the wall bracket.
2. Mount main assembly.
Warning
Not mounting all the screws and washers on the inside of the main assembly when
mounting it onto the wall bracket will affect the protection against moisture of the
wallbox, which can result in the risk of electric shock.
▶ Make sure that all screws together with their corresponding washers are mounted.
While holding the main assembly in place, insert the four screws M6 x 16 mm together with
the bonded sealing washers 6.6 mm x 11 mm and fasten them.
EN
31