8. COMMISSIONING

General Commissioning
Before connecting the wallbox to the vehicle:
1. Clean the connection zone.
2. Check wall mounting for stability.
3. Check that all screws and terminal connections are tight.
4. Make sure there are no knock-out holes for cable routing left open. Seal them
with blind plugs if there is no cable routed through them.
5. Make sure all cable glands are tightly closed.
6. Perform visual inspection according to commissioning protocol.
7. Switch on the input power to the wallbox.
8. Check HMI LED status indication.
9. Perform electric commissioning according to commissioning protocol and nor-
mative requirements and additional local installation requirements (if applicable).
10. Perform functional tests with a simulator or an EV and simultaneously check
HMI LED status indication.
11. Fill-in commissioning report.
If you need a commissioning report, find an example of it at www.elli.eco/download

9. MAINTENANCE

The owner of the wallbox is responsible for the maintenance of the charging station, where-
by both the law regarding the safety of persons, animals, and property must be observed, as
well as the installation regulations in force in the country of use.
1. Dirt and natural organic matter on the outside of the charging station can be
cleaned off using a damp soft cloth.
2. Check the charge plug for damage and for foreign matter. Clean if necessary.
3. Have the wallbox and its installation inspected by an electrician on a regular
basis and in compliance with your local country installation guidelines.