ABB Powernet EIB Manual De Instrucciones página 35

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 51
Start-up
• Replace all caps prior to putting into operation.
The function of built-in device 6958 EB-500 is software-
dependent. For programming, connect a PC to the Powernet
EIB bus line by means of the ETS or, from Version 2.1
onwards, by means of the EIB RS 232 interface or the ABB
Powernet controller (6810).
Allocation of the Physical Address
• Switch on the supply voltage.
• Press the programming button (Fig. 1, Pos. 3) on built-in
device 6958 EB-500. The red programming LED (Fig. 1,
Pos. 2) illuminates.
• The red LED extinguishes after the physical address has
been programmed.
• Note the number of the physical address on device, if
appropriate, using a non-smudge pen.
Selection/Parameterization of the Application
Please refer to the current Technical Manual for a description
of the available applications/versions and appurtenant para-
meters.
GB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

6958 eb-500

Tabla de contenido