Prepare The Site - Kohler K-2035 Guia De Instalacion

Lavabo de baño con cubresifón
Ocultar thumbs Ver también para K-2035:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Backing
Material
Water Supplies

1. Prepare the Site

Install the water supplies and drain piping according to the
roughing-in information. Install the supply stops so the handles
will not touch the shroud when fully open.
Install sufficient backing behind the finished wall to provide a
secure material for the hanger bracket and angle brackets.
Install the finished wall.
On the finished wall, draw a vertical centerline that is plumb and
that runs through the drain outlet location.
Measure 31-3/16" (792 mm) from the floor and mark the
centerline. Use a level to draw a horizontal line at the marked
location.
Center the hanger bracket against the wall and mark the outer
slots on the horizontal line.
Use lag bolts (not provided) to install the hanger bracket to the
wall. Make sure the hanger bracket is level and is secured to the
backing material behind the finished wall.
1015627-2-D
Backing
Material
Hanger
Bracket
Drain
Outlet
31-3/16"
(792 mm)
4
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido