Ecoflam OILFLAM 50.1 PR Manual De Instrucciones página 18

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 35
420010310100 OILFLAM 50.1÷200.1 PR
EN
CHECKS TO BE MADE TO ENSURE A PROPER INSTALLATION
Before proceeding with the filling of the fuel system and subsequent burner start up, it is advisable to carry out the
following checks:
- Power line must be adequate to system's adsorbed load
- Fuses must be adequate to the system's load
- Boiler's thermostats must have been properly connected
- Voltage and frequency must be within the specified limits
- Fuel type must be the one specified by the burner manufacturer
- Feed piping section must be adequate to the requested fuel flow rate
- Filters, cocks as well as fittings must have been properly installed
- Blast tube length must be the one specified by the boiler manufacturer
- Nozzle's flow rate of the burner must be adequate to boiler's output
fig. B
- 18 -

Publicidad

Tabla de contenido
loading

Tabla de contenido