LA 6347 Bighorn_- 11/29/11 9:02 AM Page 37
Fig. 29b
metal strap
Anchor-It
Anchor-It
Anchor-It Installation.
Flat Washer
Instructions for Anchoring Swing•N•Slide Activity
Centers
1. Determine the final location of your activity center.
2. Place the Anchor-It stakes adjacent to the base and near the
corners of your activity center (at the bottom of the legs on
swing sets) and twist the auger-style stakes into the ground
until only the loop is exposed.
1-1/2"
3. Place the metal strap through the loop of the Anchor-It stake
lag bolt
and secure it to the unit with a lag screw and washer as
illustrated to the right. Note: Attach the strap to the unit with
as little play as possible using whatever holes in the strap
that work best.
37
Assembly Plan