Descargar Imprimir esta página

Festo SPC200 Guía De Referencia Rápida página 21

Ocultar thumbs Ver también para SPC200:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 23
4
Check list for commissioning pneumatic axes
with WinPISA
The following check list provides an overview of the steps
required for commissioning pneumatic axes with WinPISA.
Detailed information can be found in the online help or in
the manual for WinPISA.
Step
Description
Before commissioning, set the desired hardware configuration on the
SPC200.
1.
Simulation of the existing hardware configuration in a
WinPISA project
Before commissioning, set the desired hardware
configuration on the SPC200.
S Read out the hardware configuration (recommendation)
S or set the hardware configuration manually.
Commission the pneumatic axis.
2.
Set the axis−specific parameters and load the project into
the SPC200 (pneumatic axis)
S Set the axis and application data for all axes.
S Check especially mounting offset, project zero point and
software end positions as per appendix.
The controller data are not normally modified.
Check the tubing
3.
S In order to do this carry out the movement test (see also
S In order to do this, carry out the movement test (see also
section 1.2 or WinPISA manual or system manual).
Please note: Note the information in section 1.
4.
Static and, if necessary, dynamic identification travel
S Set the operating pressure correctly (standard = 6 bar).
Festo SPC200−... 0504c English
21

Publicidad

loading

Este manual también es adecuado para:

Spc200-cpu-4Spc200-cpu-6Spc200-cpu-aif