(Ws1200vAeX0)
1. Line up front of power head assembly
with vacuum port located on the front
of the drum, as shown.
2. Place power head assembly on top of
drum.
3. Be sure lid completely covers the top
of the drum so leakage does not
occur.
4. Push down on top of the drum latch
areas to cause the flexible locking
tabs to hook onto the drum channel.
5. Make sure that the locking tabs are
snapped in place to prevent the lid
from coming off. (See inset).
Out
Flexible
Locking Tab
Push Down
WeT/DRY vAc AssemblY
Drum
Top
Assembly
Push Down
Pull Out
Flexible
Locking
Tab
Drum
Channel
Insert hose
Insert the push button end of the Dual-
Flex™ Locking hose into the inlet of the
Vac. The hose should snap into place.
To remove the hose from the Vac, press
the release button in the hose assembly
and pull the hose out of the Vac inlet,
as shown.
(Ws1600cAeX0)
Power Head
Assembly
Vacuum
Port
Release
Button
(Ws1200vAeX0)
Power Head
Assembly
Vacuum
Port
Release
Button
10
Press and Pull