Operations For Commissioning; General Warnings; First Commissioning - MBM PEG7750I Manual De Uso E Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 75

GENERAL WARNINGS

Operators have a duty to fami-
liarise themselves adequately,
using this manual before perfor-
ming any intervention, adopting the
specific safety requirements to make
every kind of human-computer inte-
raction safe.
Any technical modification that
affects the operation or safety
of the machine must only be
carried out by the technical personnel
of the manufacturer or by technicians
that are formally authorised by the
manufacturer. Failure to do so exemp-
ts the manufacturer from any liability
for for any possible resulting modifi-
cations or damage.
Even after appropriate familiari-
sation, upon the first use of the
appliance, in any case simulate
a number of test operations to save
more rapidly the main functions of the
appliance, e.g. start-up, shut-down,
etc.
The appliance is provided alre-
ady tested by the manufacturer
and fitted with the type of gas
and electrical supply specified on the
rating plate applies.
In case of supply with LPG
gas (Butane or Propane) at 50
mbar,a pressure stabilizer 50 mbar
must be installed upstream of the
appliance.

FIRST COMMISSIONING

UP / Upon completion of the opera-
tions of positioning and connection to
the power sources, perform a series of
operations such as:
1. Cleaning away of the protective ma-
terials (oils, grease, silicones, etc.) insi-
de and outside of the cooking chamber
(see section 3 / Removal of protective
materials).
2. General checks and controls such as:
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.

OPERATIONS FOR COMMISSIONING

START
- 13 -
Check opening of switches & network
gate valves (water, electricity, gas
when applicable); Checking of drains;
Checking and monitoring of the exter-
nal fumes/vapour extraction; Checking
and monitoring of the protection panels
(all the panels must be fitted correctly).
CONTROL AND REGULATION
OF THE GROUPS GAS SUPPLY
With the connection operations
described
sections completed, the applian-
ce, even if correctly calibrated during
the testing phase, requires partial veri-
fication of the parameters set directly
at the place of final destination.
The first parameter to be checked
allows verification via the type of
power supplied by the body dispensing
the correct pressure present.
PRESSURE DETECTION
GAS INLET
If the measured pressure is
lower than the 20% compared
to the nominal pressure (ex.
G20 20 mbar ≤ 17 mbar) suspend the
installation and contact the gas di-
stribution service.
If the measured pressure is hi-
gher than the 20% compared to
the nominal pressure (ex. G20
20 mbar ≤ 25 mbar) suspend the in-
stallation and contact the gas distri-
bution service.
The constructor firm does not
recognise the machines war-
ranty in case the gas pressure
is lower or higher than the values
above described.
Make sure there are no gas leaks
After controlling the pressure and
type of gas supply intervention
may be required, such as: 1. Re-
in
the
previous
5.
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido