Handling And Lifting; Installtion Of The Appliance; Room Ventilation - Angelo 0N0VT1I Manual De Uso

Plancha de inducción en vitrocerámica
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

The appliance can be handled using fork-lift or
hook equipment of suitable load-carrying capac-
ity.
Before lifting, check the position of the load's
centre of gravity.
All installation stages must be considered right
from production of the general layout.
Before starting these stages, as well as deciding
the place of installation, if necessary, the person
authorised to carry out these operations must
organise a "safety plan" to protect the people di-
rectly involved, and he must also ensure strict
compliance with all legal requirements, especial-
ly those relating to mobile work-sites.
The place of installation must have all the con-
nections needed to supply the appliance and
dispose of the production residues, must be suit-
ably lit and must meet all legal health and hy-
giene requirements to prevent the contamina-
tion of the foods.
If necessary, fi x the exact position of each indi-
vidual appliance or subassembly by mark coor-
dinates to locate them correctly (see explanatory
diagram).
Important
The room where the appliance is installed
must have air inlets to ensure that the appli-
ance can operate correctly and provide the
necessary air exchange in the room itself.
Important
The air inlets must be of appropriate size and
must be protected by gratings and placed so
that they cannot be obstructed.
3320010_inst_GB_rev.2

HANDLING AND LIFTING

INSTALLTION OF THE APPLIANCE

ROOM VENTILATION

- 7 -
Install in accordance with the relevant legislation,
regulations and specifi cations in the country of
use.
GB
ENGLISH